MSEDCL registered rooftop solar vendor

Rooftop solar.
A smarter investment in your future.

SOLAR X designs, installs and maintains grid-connected rooftop solar plants for homes, shops, industries and farms - with the PM Surya Ghar subsidy and MSEDCL net metering handled by our office.

  • Subsidy up to Rs 78,000 for homes
  • Net metering and paperwork handled by us
  • DCR modules with 25 year warranty
Up to ₹78,000 subsidy
Solar savings calculatorLive
₹3,000
You save every month ₹2,760 about ₹33,120 a year
System
2.5 kW
Payback
2.3 yrs
Subsidy
-
Get my full estimate

No obligation · takes 30 seconds

Rs 78,000Maximum PM Surya Ghar subsidy
25 yrPanel performance warranty
5 yrFree workmanship maintenance
FreeSite survey and estimate
Your numbers

See your savings before we visit

Worked out with the same rates we use in our written quotations. Move the slider to your monthly bill.

Savings estimator

What will your rooftop save?

₹ 4,000
-System
-Save / month
-Payback
 
See my full estimate
PM Surya Ghar Yojana

Government pays part of your home system

1 kW
₹30,000
2 kW
₹60,000
3 kW +
₹78,000

For residential on-grid systems. Credited to your bank account after commissioning - we help with the claim.

SolarX solar plant
One accountable team

From the site survey to the subsidy credit

We design the system, install it, complete the MSEDCL and national portal paperwork and keep the plant running.

25yr

Panel performance warranty on the DCR modules we install.

Paperwork done for you

Agreement, WCR, DCR declaration, joint inspection and commissioning report - prepared by our office.

Service that stays

Quarterly maintenance visits in the free period, then an AMC that keeps generation where it should be.

What we do

Complete rooftop solar solutions under one roof

All services
How rooftop solar works

From sunlight to a lower power bill

1

Sunlight is captured

DCR solar modules on your roof turn sunlight into DC power from morning to evening.

2

The inverter converts it

A grid-tied inverter turns it into the same AC power your wiring and appliances already use.

3

Your home uses it first

Lights, fans, AC, pumps and machines run on your own power before anything is drawn from the grid.

4

Surplus goes to the grid

The MSEDCL net meter exports what you do not use; a battery can store it where backup is needed.

5

Your bill comes down

Exported units are adjusted against what you import - the bill drops and stays predictable.

SOLAR PANELS INVERTER YOUR HOME + 0 1 2 NET METER MSEDCL GRID
How we work

From first call to a plant that keeps performing

01

Free site survey

We study your bill, roof, shading and sanctioned load before recommending anything.

Step 1
02

Proposal and design

System size, layout, expected generation, subsidy and payback - in one written proposal with nothing hidden.

Step 2
03

Portal and MSEDCL paperwork

PM Surya Ghar registration, MSEDCL application, agreement and loan file if needed - handled by our office.

Step 3
04

Installation and commissioning

Structure, modules, inverter, earthing, testing, WCR, DCR and net meter - by our own project team.

Step 4
05

Subsidy and maintenance

We follow the subsidy until it reaches your account, then keep the plant clean and healthy.

For 25 years
Questions

Questions we are asked before every installation

Still have a question?

Talk to our team directly - no call centre, no pressure.

How much subsidy do I get under PM Surya Ghar?
For a residential connection the Government of India pays Rs 30,000 for a 1 kW system, Rs 60,000 for 2 kW and Rs 78,000 for 3 kW and above. The amount is credited directly to your bank account after commissioning and net-meter installation. Commercial and industrial connections are not covered by this scheme.
How much roof area is needed?
Roughly 100 sq ft of shadow-free roof per kW on a standard structure. A 3 kW home system needs about 300 sq ft. On an elevated structure the space below stays fully usable.
What happens to the electricity I do not use?
With net metering your extra units are exported to the MSEDCL grid and adjusted against your consumption in the same billing cycle, so your meter effectively runs backwards during the day.
How long does the whole process take?
Site survey and design takes 2 days, material delivery 3 to 5 days and installation 2 to 3 days. Net meter installation depends on the MSEDCL sub-division office and usually takes 2 to 4 weeks after commissioning.
What is the warranty?
25 years performance warranty on modules (30 years on TOPCon), 5 to 10 years on the inverter as per make, and 5 years workmanship warranty from SOLAR X. The first 12 months of maintenance are free.
Does solar work in the monsoon?
Generation drops during heavy cloud cover but does not stop. Nashik and Ahilyanagar get their rain between June and September; sizing already allows for it, and the surplus generated from October to May balances the year out through net metering. Surplus units are carried forward on your MSEDCL bill through the financial year, so a strong March does make up for a wet August.
Free site survey

Let us plan your rooftop solar plant.

Tell us your average bill, your location and the roof space you have. We will tell you the right system size, what it costs after subsidy and when it pays for itself.

Solar installation in progress